Here are two customers' examples that benefited by using FPL Services for their energy-related projects:
Project: Stand-By Generation and HVAC Installation
Business: Chicos Retailer
Improvement: Installed a new 1500 kW stand-by generator for the Ft. Myers headquarters to provide complete stand-by or back-up generation. Also installed a new 320 ton air-conditioning system at the Georgia distribution center to convert the facility from a ventilation-only cooling system to an air-conditioned system.
Size: Ft. Myers headquarters - single story structure with multiple offices and open spaces; Georgia Distribution Center - 200,000 square foot warehouse and office space.
Project Costs: $1,644,000
Results: The design-build projects provided complete building stand-by/back-up power to the Headquarters and comfort cooling to the Distribution Center. As a result, Chicos was able to improve their ability to provide 24 hour service to their customers and improve the comfort of their employees.
Here's an example of an FPL customer that saved by upgrading.
Project: Facility Upgrade
Business: NASA's Solid Rocket Booster Assembly and Refurbishment Facility, Launch Control Center and Vehicle Assembly Building
Improvement: New chiller condenser pumps, replaced air compressor, lighting upgrades and replacements. Also, removed inefficient chillers and connected three facilities to a central energy plant.
Installation Cost: $3.1 million
Incentive: $46,680
Annual Savings: $442,500
|